Sunday, November 24

Kasbah Resources Updates drilling program of the Cap Zone

Google+ Pinterest LinkedIn Tumblr +

Kasbah Resources Limited announced the continuation of high grade tin mineralization from its 20 meters spaced in fill drilling program of the Gap Zone at the Achmmach Tin Project in Morocco.
Highlights;
1. The results of in fill drilling on sections 2430mE and 2470mE have successfully confirmed position, grade and geometry of the key high grade mineralization targeted for early underground extraction at Achmmach. 
2. Drilling is demonstrating potential for additional tonnage to be added to the Measured category in the next Resource update.
3. Best drilling widths from section 2430mE include:
(I). 24 meters 1.08% Sn from 304 meters
(II). (including 2 meters 3.13% Sn from 321 meters
(III). 28 meters 1.26% Sn from 314 meters (including 3 meters 6.47% Sn from 334 meters
(IV). 14 meters 1.46% Sn from 412 meters
4. Best drilling widths from section 2470mE include:
(I). 29 meters 1.13% Sn from 274 meters (including 6 meters 1.69% Sn from 280 meter).
(II). 22.6 meters 0.79% Sn from 300.4 meters (including 7 meters 1.23% Sn from 307 meters)
(III). 15 meters 1.38% Sn from 313 meters (including 4 meters 2.63% Sn from 316 meters)
(IV). 23 meters 1.38% Sn from 316 meters (including 5 meters 2.96% Sn from 316 meters.
5. Approximately 800 assays are now pending.
6. Resource update expected in Quarter 3, 2013
Sections 2430mE and 2470mE (refer Figures 1, 2 and 3) have successfully:
1. Increased resolution in a key area of the ore body targeted for early stage underground development;
2. Demonstrated the general continuity of the high grade mineralized core defined in the March 2013.
Resource model; and
1. Returned consistent moderate to high grade results from secondary targets at intermediate and deeper levels.
Source – Strategic Research Institute
(www.steelguru.com)

Share.

About Author

Comments are closed.